A ZYD-100 carries three motors: the X-100 vacuum pump, the JRP-500 roots blower and the ZH screw oil pump. The total power is written as 72 + 5 kW, the installed capacity is prepared from the sum of the two figures, and the supply is three-phase 380V / 50Hz. The commonest situation on site is this: the main breaker is closed, the distribution board trips at once, resetting and closing again trips as well, and the first reaction is usually that the supply capacity is too small, followed by a larger breaker being fitted.
That judgement is wrong about half of the time. The current drawn by a motor at the moment of starting is far above its rated running current, and the multiple depends on the motor type and the inertia of the load. If all three motors are closed at the same moment, the surges add up and the momentary demand goes clearly above the normal running load; add to that the conditions that exist only at startup, such as air still in the pipework and a pump casing not yet full of oil, and a trip can easily happen on a machine that is itself perfectly sound.
Three causes to rule out first
The control cabinet of the machine carries phase loss and phase sequence protection. With a phase missing, the running torque of the motor is short of what the load needs, the speed does not come up and the current stays high, which finally presents as an overcurrent trip; what the site sees is almost identical to a capacity problem, but the cause is not the same at all, and a wrong phase sequence behaves the same way. The first thing to establish is therefore whether the protection inside the cabinet has operated, not whether the distribution board should be changed.
The second thing is the starting order. The process order of the machine is to build the vacuum and bring the heating to the set point before the oil enters, and the pump groups have their own sequence as well. If the closing is done by hand, pushing all three motors up at once makes the surge more likely. Putting the start sequence back to the process order is the cheapest step of all.
The third thing is the load state: whether the elements are blocked and the pressure is already high, whether there is still oil in the tank, since running dry makes the pump draw air and traps it in the pipework, and whether the oil temperature is too low, which raises the viscosity and with it the starting load.

| What is seen | The more likely direction | The first step |
|---|---|---|
| It trips as soon as the breaker is closed, and keeps tripping after a reset | Phase loss or wrong phase sequence | Check whether the phase loss and phase sequence protection has operated, and verify the phase sequence with a meter |
| It trips at the moment of starting, then runs normally | Several motors closed at once, surges adding up | Close them one at a time in process order |
| It trips after running for a while, having been fine before | Rising resistance on the load side | Read the pressure and the oil temperature and judge whether the resistance in the filtration stage has grown |
| The trip comes with a dry-running sound from the oil pump or noise in the pipework | Pump casing not full, air trapped in the pipework | Check the oil level and look for an air lock in the inlet line |
Manual switching and automatic starting are not the same thing
On machines with PLC smart control and a touchscreen, the starting sequence can be written into the control logic: after power-on the machine first reads the emergency stop state, the level signal and the feedback from the vacuum and pressure switches, accepts a start command only once everything is confirmed normal, and brings up the pump groups step by step in process order. Manual switching works the other way round: pushing three motors up means three surges at once.
So when the breaker trips as soon as it is closed, the first question is whether this machine has PLC smart control and a touchscreen at all. Without it, close one motor at a time by hand; with it, leave the starting to the control logic rather than fighting its sequence over. Whether the order is right often matters more than how large the breaker is.
Do not fit a bigger breaker first
A larger main breaker does stop the trip from happening, but that removes the protection layer, and the real cause then shows up later in a different form that is harder to trace. The right order is to check whether the protection operated, then the starting order, then the load, and only at the end to confirm with the capacity calculation on the supply side whether the supply really is too small. For that calculation, use the sum of 72 + 5 kW together with the three-phase 380V supply conditions and compare it with the current measured on site; a large difference means there are other loads or a wiring problem on site.
- Record before resetting after a trip: the moment the protection operated, the three gauge readings at that time, and which motors had been closed.
- Do not skip the phase loss and phase sequence protection and close the breaker to test the machine: that layer is one of the conditions for safe operation.
- Before changing the cable size or the connection plan, make sure the problem is not the starting order.

A breaker that trips at once is usually not a machine that has failed but the current surge at startup; check the protection and the order first, and talk about the breaker last.