The vacuum stage of an oil purifier does two things: it breaks the oil into a mist, and it draws the water and the gas out of that mist. The two ask different things of the machine. The amount of atomisation is set by the quantity of oil that enters the vacuum stage, and the pumping capacity has to cover the gas load that the atomisation creates. If the pumping capacity cannot keep up, the negative pressure never builds up; if it is far above what is needed, the price is energy and machine size.
The standard configuration of the vacuum stage
The ZYD series is fitted with two pumps: the vacuum pump X-100 establishes the working vacuum, and the roots blower JRP-500 works as the booster in front of it and pushes the ultimate vacuum down to ≤5 Pa. The division of work is fixed, and the level the other pump can reach on its own is limited.
The result of that arrangement is the pair of figures on the parameter sheet: the working vacuum of -0.08 ~ -0.0999 MPa is the running range, and the ultimate vacuum of ≤5 Pa is what the system can manage in its limit state. The first decides whether the degassing stage can work at all; the second decides whether the system can rule out interference when there is residual gas in the pipework.
Two pumps in series rather than one larger pump is a matter of division of work: the roots blower lowers the pressure in front, the vacuum pump then works against a smaller pressure difference, and that is where there is room to improve the pumping speed. The lowest pressure the system can reach is set by the limit of the individual pump, and the booster in front cannot change that. When the system is pulled down to its limit along a closed line, the advantage of the two stages becomes visible, and that is why the ultimate vacuum is measured in a test state rather than read off the gauge during degassing.

| Configuration and indicator | Parameter | The problem it solves |
|---|---|---|
| Vacuum pump | X-100 | Establishing the working vacuum range |
| Front stage booster | JRP-500 (roots blower) | Pushing the ultimate vacuum down to ≤5 Pa |
| Working vacuum | -0.08 ~ -0.0999 MPa | The negative pressure the chamber can hold while it runs |
| Ultimate vacuum | ≤5 Pa | The lowest pressure the system reaches in its limit state |
The pumping capacity follows the oil
The quantity of oil that enters the vacuum stage is set by the throughput: the ZYD-100 handles 6000 L/h, the ZYD-200 handles 12000 L/h and the ZYD-300 handles 18000 L/h. The larger the throughput, the more oil enters the vacuum stage in the same period of time, the more oil vapour mixture is produced, and the more the pumping demand grows.
So when the vacuum stage is discussed, the question cannot be only how deep the vacuum can go; it also has to be how deep it stays at a given throughput and after how many hours of continuous running. On site the test for that is whether the vacuum level becomes shallower as the machine runs: the longer it runs and the shallower it reads, the closer the pumping capacity is running at its limit.
Two phases have to be told apart as well. While the vacuum is being pulled at the start, there is no oil in the tank, the gas load is small and the vacuum comes up easily; once the degassing stage starts, what enters the chamber is an oil vapour mixture and the load rises at once. The difference between the two phases shows that a vacuum that pulls down easily is no proof that the pumping capacity is enough during degassing, and the judgement has to be made with oil in the machine.
- The typical sign of insufficient pumping capacity: the vacuum settles before it reaches the range after starting, and the reading becomes gradually shallower during continuous running.
- When the inlet oil temperature is low, the oil is atomised more slowly, the momentary gas load is lower than in normal operation, and the vacuum looks better; the problem is then hidden in the figures of the oil.
- Oil with a high water content produces a much larger load of water vapour than dry oil, and the same throughput asks more of the pumping capacity.
Five questions to ask the site
Whether the vacuum stage is matched correctly depends on the conditions on site and not on the machine itself: how much oil is to be treated each time, how much water and gas the oil holds now, what level the oil temperature can be kept at, whether the machine runs continuously or intermittently, and the altitude and the ambient temperature at the site. Altitude affects the vacuum level, and the ambient temperature range is -20~45 °C; both conditions have to be raised at the stage of selection.
The vacuum level is an indicator, the pumping capacity is a matching problem; the larger the throughput and the wetter the oil, the more the pumping capacity is asked for.