When a substation or a workshop runs two vacuum oil purifiers and a plate and frame filter press at the same time, the meter box usually carries a single main meter. To work out how much each machine consumes, the first step is not to read the meter but to establish how many circuits these machines can be split into on the supply. Without circuit tags, a split consumption figure can only be guessed.
Start by writing down the power of the machines themselves
Before reading any meter, check the figures on the nameplates. The total power of the ZYD-100 is 72 + 5 kW and the supply is three-phase 380V / 50Hz; the ZYD-200 and the ZYD-300 follow the same series figures, with flow rates of 12000 L/h and 18000 L/h respectively; the TYA-50 handles 2000 L/h and the TYA-100 4000 L/h; the LY-200 handles 4800 L/h with an 11 kW motor; and the TYG-100 is a mobile vacuum oil purifier of 6000 L/h.
The way 72 + 5 is written already says one thing: this is not a single figure but two loads. Which group is the heating and which group is the pump group is settled by the circuit diagram in the accompanying documents, not by experience. Reading the two groups separately is what shows the difference between no load and load.
How to tag a circuit so that the tag is useful
The tagging itself is simple; the trouble is that it has to be done in two places. Put one label on the circuit breaker and one on the machine itself, write the same tag in both places, and add the model of the machine next to the tag. You can then walk from the meter box to the machine without having to remember which cable is which. The terminal strip inside the cabinet matters most here: the main circuit, the heating circuit and the pump circuit of a machine are separate, and if they are not marked on the terminal strip, isolating one group means stopping the whole machine.

| What is tagged | Where the tag goes | Why |
|---|---|---|
| Outgoing circuit | Panel of the circuit breaker | This is the physical position the meter reading belongs to |
| Machine end | Next to the nameplate or on the inside of the control cabinet door | The machine can be found from the meter box without guessing |
| Branches inside the cabinet | Each way of the terminal strip | The group that has to be stopped can be stopped on its own |
| Measuring circuits | Terminals of the meters | The meters are electrical loads as well, and they belong in the account |
When the readings do not agree, work through them in this order
- Check the multiplier of the meter first. A wrong multiplier is the most common fault of this kind, and it puts the reading out by a multiple.
- Then check whether other equipment has been bridged onto this circuit. A temporary immersion heater, a drain pump or a lighting socket hung off the same breaker is not unusual.
- Then add up the auxiliary loads of the machine. The heating, the pump group, the controls and the instruments are all counted inside the 72 + 5 kW, so a single circuit reading will never reconcile on its own.
- Only then suspect the machine itself. A fault on the machine side normally shows up in the current before it shows up in the figure on the main meter.
Unbalance on a three-phase 380V circuit
These machines are three-phase loads, and the supply is three-phase 380V / 50Hz. With an unbalanced load the main ammeter reads higher than the three-phase average, and the heating concentrates in the phase carrying the highest current. The test is not complicated: measure the three phase currents with a clamp meter and look at the difference between the highest and the lowest. If the difference is marked, check first whether the terminals of that phase have come loose, or whether several machines share that phase.
Phase failure and phase sequence protection are fitted to the machine itself. They ensure that the machine does not keep running with a phase missing; they cannot replace a balanced circuit. When a loose terminal raises the contact resistance, the protection may not operate at all while the machine keeps running hot, and faults of that kind can only be found at the circuit level.
When the meter reading does not reconcile, get the tagging straight before you look at the multiplier; in the other order you can spend a long time hunting on the meter.